Technician utilization rate, explained
For the paid-hour planning measure in this article, technician utilization = actual productive job hours / total paid hours. Record both over the same period and say what you include. With 1,560 productive hours out of 2,080 paid hours, the result is 75 percent.
That is not the same as ServiceTitan’s Billable Efficiency. Its mobile scorecard compares sold hours, with technician splits applied, against actual worked hours for completed jobs. Six sold hours completed in four actual hours is 150 percent efficiency. That can be a valid result, not a timekeeping error.
ServiceTitan calls the estimated labor hours attached to a pricebook item sold or billable hours. They are not a stopwatch reading. The platform also provides reports and technician scorecards; check the definition and filters of the KPI you use rather than assuming every percentage measures the same thing.
What the number is worth in dollars
Our free Loaded Labor Rate Calculator opens on a set of HVAC starting inputs: a 28 dollar wage, four trucks, one owner salary, two office seats, the usual payroll burden and a monthly overhead figure. Leave every one of them alone and drag the utilization slider.
At 65 percent of 2,080 paid hours, the example has 1,352 productive hours a year and a modeled cost of $119.32 per productive hour. At 75 percent it is 1,560 hours and $103.41. At 85 percent, 1,768 hours and $91.25. These are sensitivity examples, not measured industry norms. Use an input whose meaning matches this cost-recovery model, not a sold-hour efficiency percentage.
Nothing about that technician changed. What changed is the assumed share of paid time available for productive work.
Which is why the guess matters so much. A shop that assumes 85 and actually runs 65 is pricing a 91 dollar hour that costs 119. That gap rides on every flat rate in the book and on every dynamically priced service, and it does not announce itself. The prices look like prices.
How to work out your own
- Pick a consistent period. Use the same dates for payroll and job time. A quarter or year helps smooth seasonality; a shorter period can be useful operationally if you label it clearly.
- Define paid hours. For annual cost recovery here, include regular pay, overtime hours counted once, paid PTO, holidays, training, shop time and other paid time. Do not assume every employee has exactly 2,080 hours. If you exclude leave to measure available working-time utilization instead, label that different denominator and account for its cost elsewhere.
- Classify actual time. Use recorded productive job time, not the estimated hours stored on sold services. Document treatment of travel, diagnosis, warranty work and rework. Apply it consistently and avoid overlapping time entries.
- Divide productive by paid hours. Sum the hours across the crew before dividing; do not average percentages from technicians with different paid hours.
Compare ServiceTitan’s Billable Efficiency separately, using its completed-job and technician-split rules. A high efficiency percentage does not prove high paid-hour utilization: a technician can finish jobs ahead of the sold-hour allowance and still spend much of the week waiting for work.
What counts, and what quietly does not
Travel, shop time, training and idle time cost money even when you classify them outside productive job time. Paid leave also belongs in this article’s annual paid-hour denominator. Keep those categories visible rather than making them disappear from the calculation.
Diagnosis is actual work whether the service-call fee is collected separately or credited toward a repair. Waiving that fee does not prove nobody paid for the time; a flat-rate repair may already cover it. Classify diagnostic time consistently and review the total job price and cost.
Likewise, track warranty work and rework separately so you can see the cost of repeat visits. Decide whether your operational numerator includes them, name the metric accordingly, and keep that choice stable across comparisons. The objective is a useful planning measure, not a percentage that looks good.
The other half of the same arithmetic
The paid-time recovery assumption affects what one productive hour needs to cover. The hours written on each service decide how many of those hours you charge for. Both are hour math, and neither one throws an error when it goes wrong.
We went through a book once where a whole category of package unit installs carried no labor hours at all. The shop had dynamic pricing switched on, and a dynamic price in ServiceTitan builds up from billable hours times the labor rate, plus the linked materials and equipment. It does that exactly as designed. With the hours field sitting empty there was simply nothing on the labor side to build from, so a roughly four thousand dollar install was going out well below what that work costs. Adding six sold hours restored the labor component of that calculation.
Nobody had entered a wrong number. The number was never there to be wrong.
So a book can be underpriced from the denominator, from the numerator, or from both at once, and in all three cases every line in it still looks like a real price. That is the argument for checking the arithmetic rather than eyeballing the output.
Two honest ways to move it
The first is to increase productive work within the hours you already pay for. Tighter routing so the afternoon drive is shorter. Fewer go backs, which is usually a parts and diagnosis problem rather than a scheduling one. Membership and maintenance work sitting in the calendar to fill the weeks that would otherwise be empty.
The second is to stop paying for hours you cannot recover, which means matching headcount to real demand rather than to the busiest month you had last year.
Both are operations work. They belong in a pricing conversation anyway, because every point of utilization you win comes off the cost of an hour without touching a single price. It is the only lever here that lowers your cost without asking a customer for more. Worth watching alongside the other numbers you check on a Monday, and it sits directly under revenue per employee, which asks the same capacity question from the top of the business rather than the bottom.
Start with payroll, actual time records and the relevant scorecard definitions. Reconcile them before using the percentage in a pricing decision.
None of it pays off if the technician opens the tablet and finds one flat number with nothing to present next to it. The hours, the options and the way the price gets built are one system, and building that system is the work we do. The Present-Don’t-Configure Method™ is how the pieces fit together, and how to calculate your loaded labor rate is the rest of the cost ladder this number sits at the bottom of.
FAQ
How do you calculate technician utilization rate?
For the paid-hour planning measure used here, divide actual productive job hours by total paid hours for the same period. Include paid leave in the denominator when modeling annual payroll recovery, and state that choice. Do not substitute estimated sold hours for actual time. With 1,560 productive hours and 2,080 paid hours, utilization is 75 percent.
What is a good technician utilization rate?
There is no universal target established here. Compare the same job types, period and time definitions within your own business. The 65, 75 and 85 percent figures below are calculator scenarios, not industry benchmarks. ServiceTitan Billable Efficiency is a different metric and can legitimately exceed 100 percent.
What counts as a billable hour?
ServiceTitan uses sold or billable hours for the estimated labor hours on a pricebook item. That is not necessarily elapsed job time or hours a customer paid for separately. For utilization, define productive time from actual time records; for Billable Efficiency, compare sold hours with actual worked hours on completed jobs.